ROvACC Documents
latest

1. Training

  • Introduction to ROvACC Training!
  • ATC Career Procedure
  • TOWER TRAINEE (STUDENT 1)
  • TOWER CONTROLLER (STUDENT 2)
  • APPROACH CONTROLLER (STUDENT 3)
  • ENROUTE CONTROLLER (CONTROLLER 1)

2. Airports

  • LRBB FIR Airports

Euroscope Setup

  • First install
  • AIRAC update
ROvACC Documents
  • »
  • Welcome to ROvACC Training Documents!
  • Edit on GitHub

Welcome to ROvACC Training Documents!

Welcome text …

Note

This project is under active development.

Contents

1. Training

  • Introduction to ROvACC Training!
  • ATC Career Procedure
  • TOWER TRAINEE (STUDENT 1)
  • TOWER CONTROLLER (STUDENT 2)
  • APPROACH CONTROLLER (STUDENT 3)
  • ENROUTE CONTROLLER (CONTROLLER 1)

2. Airports

  • LRBB FIR Airports
    • LRAR - Arad International
    • LRTR - Timișoara Traian Vuia International
    • LRBS - Băneasa Aurel Vlaicu International
    • LROP - Otopeni Henri Coandă International Airport
    • LRCK - Constanța Mihail Kogălniceanu International
    • LRCL - Cluj Avram Iancu International
    • LRSB - Sibiu International
    • LRTM - Târgu Mureș International

Euroscope Setup

  • First install
  • AIRAC update
Next

© Copyright 2015-2022, rovacc.ro. Revision 2c866d63.

Built with Sphinx using a theme provided by Read the Docs.
Read the Docs v: latest
Versions
latest
euroscope-setup
Downloads
pdf
html
epub
On Read the Docs
Project Home
Builds